top of page

Project Title: Proposed BIM Centre at National University Singapore (SDE2)

Project No: A&A 01

Lot No: MK03-05112L

Company: BIMsters Pte Ltd

Country: Singapore

Project Location/Road: 4 Architecture Drive, National University of Singapore, S117566

Contract Type/Delivery Method: Design and Build

 

Brief Project Description: To take over part of the corridor at level 3 in SDE2 to optimise space for BIM lab use. Removal of part of partition.  Remove wall to have bigger space for BIM Lab. To include BIM Centre Admin Office and convert e-studio to BIM Studio

 

Project Schedule/Phases/Milestones: Include BIM milestones, pre-design activities, design analyses and processes, taking down and interior fit out works and other events which occur during the project lifecycle.

Existing layout for level 3

Demolished Works for Level 3 (Shown in yellow)

New Works for Level 3

(Shown in Magenta)

New Layout for Level 3

Interior Rendering

Proposal A

bottom of page